Want to find out the circuit length, geographical area of the grid territory or average interruption time? Here you can find all the important structure data.
EnWG | EHV | S EHV/HV | |
---|---|---|---|
§ 23c (1) Nr. 1: Circuit length of overhead lines (km) | 3.098 | 1,0 | |
§ 23c (1) Nr. 1: Circuit length of cables (km) | 3 | 9,0 | |
§ 23c (1) Nr. 2: Installed capacity at substation level (MVA) | 5.870 | 21.030 | |
§ 23c (1) Nr. 3: Annual energy used by customers (GWh) | 1.199 | 35.726 | |
§ 23c (1) Nr. 4: Connection points | 99 | 85 | |
§ 23c (1) Nr. 5: Number of inhabitants in the grid area | approx. 11 million | ||
§ 23c (1) Nr. 6/7: Served area/Size of control area (km2) | 34.600 | ||
§ 23c (1) Nr. 8: Number of sampling points with a power measurement every fifteen minutes or a meter reading | 102 | ||
§ 23c (1) Nr. 9: Responsible measuring point operator | TransnetBW GmbH | ||
§ 23c (1) Nr. 10: Contact for grid access | Contact |
EnWG | EHV | S EHV/HV | |
---|---|---|---|
§ 23c (1) Nr. 1: Circuit length of overhead lines (km) | 3.100 | 1,0 | |
§ 23c (1) Nr. 1: Circuit length of cables (km) | 4,0 | 9,0 | |
§ 23c (1) Nr. 2: Installed capacity at substation level (MVA) | 5.870 | 21.030 | |
§ 23c (1) Nr. 3: Annual energy used by customers (GWh) | 960 | 37.846 | |
§ 23c (1) Nr. 4: Connection points | 17 | 84 | |
§ 23c (1) Nr. 6/7: Served area/Size of control area (km2) | 34.600 | ||
§ 23c (1) Nr. 8: Number of sampling points with a power measurement every fifteen minutes or a meter reading | 101 | ||
§ 23c (1) Nr. 9: Responsible measuring point operator | TransnetBW GmbH | ||
§ 23c (1) Nr. 10: Contact for grid access | Contact |
StromNEV | EHV | S EHV/HV | |
---|---|---|---|
§ 27 Abs. 2 Nr. 1: Circuit length of overhead lines (km) | 3.154 | 1,0 | |
§ 27 Abs. 2 Nr. 1: Circuit length of cables (km) | 4,0 | 9,0 | |
§ 27 Abs. 2 Nr. 2: Installed capacity at substation level (MVA) | 5.570 | 20.980 | |
§ 27 Abs. 2 Nr. 3: Annual energy used by customers (GWh) | 1.029 | 36.433 | |
§ 27 Abs. 2 Nr. 4: Connection points | 18 | 85 | |
§ 27 Abs. 2 Nr. 7: Size of control area (km2) | 34.600 | ||
§ 27 Abs. 2 Nr. 8: Number of sampling points with a power measurement every fifteen minutes or a meter reading | 103 | ||
§ 27 Abs. 2 Nr. 9: Responsible measuring point operator | TransnetBW GmbH |
StromNEV | EHV | S EHV/HV | |
---|---|---|---|
§ 27 Abs. 2 Nr. 1: Circuit length of overhead lines (km) | 3.153 | 1,0 | |
§ 27 Abs. 2 Nr. 1: Circuit length of cables (km) | 3,0 | 8,0 | |
§ 27 Abs. 2 Nr. 2: Installed capacity at substation level (MVA) | 5.570 | 21.110 | |
§ 27 Abs. 2 Nr. 3: Annual energy used by customers (GWh) | 1.149 | 38.658 | |
§ 27 Abs. 2 Nr. 4: Connection points | 18 | 84 | |
§ 27 Abs. 2 Nr. 7: Size of control area (km2) | 34.600 | ||
§ 27 Abs. 2 Nr. 8: Number of sampling points with a power measurement every fifteen minutes or a meter reading | 102 | ||
§ 27 Abs. 2 Nr. 9: Responsible measuring point operator | TransnetBW GmbH |
StromNEV | EHV | S EHV/HV | |
---|---|---|---|
§ 27 Abs. 2 Nr. 1: Circuit length of overhead lines (km) | 3.184 | 1,0 | |
§ 27 Abs. 2 Nr. 1: Circuit length of cables (km) | 3,0 | 8,0 | |
§ 27 Abs. 2 Nr. 2: Installed capacity at substation level (MVA) | 5.570 | 20.610 | |
§ 27 Abs. 2 Nr. 3: Annual energy used by customers (GWh) | 1.321 | 41.217 | |
§ 27 Abs. 2 Nr. 4: Connection points | 19 | 85 | |
§ 27 Abs. 2 Nr. 7: Size of control area (km2) | 34.600 | ||
§ 27 Abs. 2 Nr. 8: Number of sampling points with a power measurement every fifteen minutes or a meter reading | 104 | ||
§ 27 Abs. 2 Nr. 9: Responsible measuring point operator | TransnetBW GmbH |
EHV | S EHV/HV | |
---|---|---|
Annual energy used by customers (GWh) | 1.257 | 42.078 |
Circuit length of overhead lines (km) | 3.187 | 0,9 |
Circuit length of cables (km) | 3,2 | 7,1 |
Installed capacity at substation level (MVA) | 5.570 | 20.630 |
Connection points | 18 | 85 |
Size of control area (km2) | 34.600 |
EHV: Extra high voltage, S: Substations, HV: High voltage, GWh: Gigawatt hours, MVA: Megavolt amperes
StromNEV (EnWG) | EHV | S EHV/HV | |
---|---|---|---|
§ 10 (2) (§ 23c (2) Nr. 3): Annual energy (GWh) | 967 | ||
§ 10 (2): Grid losses (%) | 2,3 | 0,3 | |
§ 10 (2) (§ 23c (2) Nr. 7): Average procurement costs (€ct / kWh) | 8,4 |
StromNEV (EnWG) | EHV | S EHV/HV | |
---|---|---|---|
§ 10 (2) (§ 23c (2) Nr. 3): Annual energy (GWh) | 803 | ||
§ 10 (2): Grid losses (%) | 1,8 | 0,3 | |
§ 10 (2) (§ 23c (2) Nr. 7): Average procurement costs (€ct / kWh) | 3,9 |
StromNEV | EHV | S EHV/HV | |
---|---|---|---|
Annual energy (GWh) | 658 | ||
§ 10 Abs. 2: Grid losses (%) | 1,5 | 0,3 | |
§ 10 Abs. 2: Average procurement costs (€ct / kWh) | 5.3 |
StromNEV | EHV | S EHV/HV | |
---|---|---|---|
Annual energy (GWh) | 686 | ||
§ 10 Abs. 2: Grid losses (%) | 1,4 | 0,3 | |
§ 10 Abs. 2: Average procurement costs (€ct / kWh) | 3,5 |
StromNEV | EHV | S EHV/HV | |
---|---|---|---|
Annual energy (GWh) | 780 | ||
§ 10 Abs. 2: Grid losses (%) | 1,5 | 0,3 | |
§ 10 Abs. 2: Average procurement costs (€ct / kWh) | 2,8 |
EHV | S | EHV/HV | |
---|---|---|---|
Grid losses (%) | 1,7 | 0,3 | |
Annual energy (GWh) | 862 | ||
Average procurement costs (€ct / kWh) | 2,8 |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 35 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 37 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 39 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 37 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 40 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 43 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 43 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 44 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 44 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 44 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
187 | 46 | 2min 8sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 47 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 50 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 51 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 52 | 0min 0sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
229 | 52 | 2min 20sec |
EENS-SI [MWh] | YEC [TWh] | AIT |
---|---|---|
0 | 52 | 0min 0sec |
„Estimated Energy Not Supplied for each Sustained Interruption“
„Yearly Energy Consumption“
„Average Interruption Time“
Steffen Klausnitzer
Marketing, Transparency, Disclosure Requirements